John F. Kennedy International Airport (JFK) Terminal 1

The Port Authority of New York and New Jersey has undertaken the historic $19 billion transformation of John F. Kennedy International Airport (JFK) into a world-class airport. The program includes the construction of a New Terminal One (NTO), a 23-gate all-international terminal and the largest terminal at JFK. The 2.4 million-square-foot terminal features expansive, naturally lit public spaces, cutting-edge technology, and a range of amenities designed to enhance the customer experience.
The design and Construction of NTO includes reconstructing the roadway entrances into the airport, as well as providing a new multi-level roadway entrance for arriving and departing passengers into the new terminal. The existing terminal will consist of a headhouse, including check-in, security checkpoints, baggage claim, and mechanical infrastructure, for the full build-out of the new facility. The project includes reconfiguration of the roadways and all utilities. Stormwater, sanitary sewer, water, medium-temperature hot water, chilled water, telecommunications ducts, and electrical ducts and services will be realigned in the interim and final phases of construction for the new terminal.
UrbanNY provided interim and final design for sanitary sewer, medium-temperature hot water, chilled water, domestic water, natural gas, as well as 3D modeling in Civil 3D and Navisworks, to coordinate with the Revit building and site/stormwater models. UrbanNY assisted with the 3D modeling of all landslide utilities, including stormwater, electric, and communications, for this project. UrbanNY also provided construction administration and management services, which included weekly coordination with the design-builder and other stakeholders, responding to RFI’s, submittals, and shop drawings, and providing redesigns, as necessary, based on contractor phasing.
AECOM/Tishman (PANYNJ)